Case Study 1: Cylinder Head Test and Assembly Eclipse Automation provided a fully automatic cylinder head assembly and testing system. The system included extensive data tracking capabilities and included all part transport and manipulation operations. The project consisted of the following operations. - Cylinder head washer tending (via large overhead robotic tender). - Valve seat insertion (Eclipse Automation has experience with and without pre-soak in liquid Nitrogen) - Valve guide insertion - Cam Bearing insertion - Cup Plug insertion (with Loctite application) - Injector Sleeve insertion - Pipe lug insertion - Sherex Plug insertion - Leak testing - Functional testing - Cylinder head transport (via robotics, walking beam and conveyor). |
|||