Skip to main content

Results for:

Why digital twin simulation ROI is hard to prove

Digital twin simulation ROI is hard to prove because the value arrives as avoided cost, and avoided cost rarely gets a line item. This article explains exactly where factory simulation business cases tend to break down, how to price risk reduction, and how to connect throughput and deployment speed to numbers your capital committee already trusts.

Read More

What to know about factory automation providers

Factory automation providers differ most in engineering depth, validation rigor, systems integration, lifecycle support, and global delivery. This guide gives engineering and operations leaders a practical way to evaluate each one, with the questions to ask about digital twins, PLC and MES integration, safety-critical validation, and post-commissioning support before committing capital to a new production line.

Read More

What is nuclear grade factory automation?

Nuclear grade factory automation covers production and handling systems qualified to nuclear standards, from robotic material handling to remote inspection cells. This guide explains what separates nuclear grade equipment from standard industrial automation, how quality programs such as NQA-1 shape the build, and the questions procurement leaders should ask before selecting a nuclear facility supplier.

Read More

9 questions to choose a factory automation partner

Selecting a factory automation partner is a technical decision with a long tail. These nine questions help engineering and operations leaders test process proof, machine vision depth, PLC, MES, and SCADA readiness, delivery model, automotive production scale, industrial mobility strategy, and lifecycle support, so every vendor on the shortlist gets scored against the same evidence.

Read More

7 causes of assembly line commissioning delays

Automated assembly line commissioning delays rarely start at startup. They begin months earlier, in scope definition, part data, and controls planning. This article breaks down the seven most common causes, from late design changes and unvalidated vision systems to compressed acceptance testing, and outlines the planning, integration, and validation steps that help manufacturing leaders protect launch dates.

Read More

How to compare industrial robotics and AGV providers

Choosing between industrial robotics and AGV providers takes more than a spec sheet comparison. This guide walks engineering, operations, and procurement leaders through the technical, integration, and lifecycle factors that separate a true enterprise automation solution from a one-time equipment purchase.

Read More

How to compare factory digital twin vendors

Choosing a factory digital twin simulation vendor comes down to four things: data readiness, simulation fidelity, PLC/MES/SCADA integration depth, and a real path from pilot to plant-wide rollout. This guide breaks down the criteria manufacturing and operations leaders should use to evaluate vendors, plus how to build a business case that finance will approve.

Read More

Smart Metering Automation Flyer

Discover how Eclipse Automation supports smart meter production with automated material handling, assembly, testing, and inspection solutions for gas, water, electric, and internet meters.

Read More

Tube Set Automation Flyer

Explore Eclipse Automation’s end-to-end tube set automation capabilities, from precision cutting, forming, coiling, and component assembly to testing, inspection, packaging, and traceable labelling.

Read More

Vendor Partnerships Flyer

Discover how Eclipse Automation collaborates with vendors, integrators, and technology providers to deliver end-to-end automation solutions, accelerate project execution, and create better outcomes across industries.

Read More

Back to top